So the music studio is coming along... The blue on the concrete blocks is not the final color. That is the sealant.
It is a 2X6 frame for better insulation.
The inside floor will be raised for better acoustics.
And I have had plenty of help.
The roof will be metal. We are testing it out in case we want to go that way on our home building project. Vicky and I went down to the local metal fabricator and picked out what we liked and cut it on the spot. A little harder than a paper cutter, but the same concept.
I got the rafters up yesterday!
We are also advancing on our home. The subfloor plumbing is almost done.