Still waiting on some engineering approvals on the house.... In the meantime, we are making some headway on the music studio. A little trimming of the branches around the studio's front porch.

The outside walls are coming along. We should have them done tomorrow.



I was over at a friend's house a couple days ago and watched the moon rise over the local hills. It was spectacular and my iPhone picture doesn't do it justice. What a great area to live in.

Saturday, September 6, 2008

So the music studio is coming along... The blue on the concrete blocks is not the final color. That is the sealant.



It is a 2X6 frame for better insulation.



The inside floor will be raised for better acoustics.


And I have had plenty of help.


The roof will be metal. We are testing it out in case we want to go that way on our home building project. Vicky and I went down to the local metal fabricator and picked out what we liked and cut it on the spot. A little harder than a paper cutter, but the same concept.




I got the rafters up yesterday!



We are also advancing on our home. The subfloor plumbing is almost done.